Eastern Municipal Water District, CA

Restoring Source Water Quality and Exploring Supply Resiliency Opportunities

Eastern Municipal Water District (EMWD) supplies water to nearly one million people in Riverside County, California. Nitrates, perchlorate, iron, manganese, per- and polyfluoroalkyl substances (PFAS), and volatile organic compounds (VOCs) were contaminating groundwater in the Perris North basin, which forced the shutdown of some critical drinking water wells. EMWD needed a long-term solution to ensure drinking water delivered to 15,000 households annually was safe and reliable. In 2020, the district launched an ambitious effort to clean up the aquifer and create a new source of safe, locally controlled drinking water for the community.

Treating Groundwater for Contaminants

As a longstanding partner with EMWD, Woodard & Curran was hired as program manager for the Perris North Groundwater Program. The project goal was to contain the contamination plume, restore groundwater for the drinking water supply, and bolster the region’s drought resilience. Woodard & Curran’s expert staff has worked as an extension of EMWD staff to manage design and construction of groundwater treatment facilities. This includes construction of a centralized system for treating up to 3,500 acre-feet per year (AFY) of groundwater, six groundwater extraction wells, seven miles of conveyance pipelines, and a network of 15 groundwater monitoring well locations.

In our work with EMWD since 2000, our hydrogeological experts have conducted various modeling studies, data science, hydrogeologic planning studies, and field investigations, including quality control and data refinement for the San Jacinto Flow Model (SJFM2020). This project included groundwater modeling as part of a feasibility study to evaluate the impact new wells would have on nearby groundwater levels and flow direction.

In our capacity as program manager, we oversee the budget and schedule, maintain compliance with California Environmental Quality Act (CEQA) and grant funding requirements, and participate in stakeholder outreach. We developed and managed four separate design contracts totaling nearly $6 million and we provided technical reviews of drawing packages, specifications, and bid documents.

3,500

AFY Treated Groundwater

$62 Million

Grant Funding

By spring of 2025, approximately seven miles of pipeline was laid to connect groundwater wells to the Perris North Groundwater Treatment Facility. Construction of the centralized treatment facility, which has a treatment train that includes greensand filtration, GAC, and IX is expected to be completed by the end of 2026, along with the drilling and equipping of six groundwater extraction wells. The monitoring wells will continue to be sampled on a quarterly basis by EMWD staff for the next 25 years. Once complete, the project will result in the extraction and treatment of 3,500 AFY of groundwater for potable reuse.

Aerial view graphic rendering of the Perris North Groundwater Treatment Facility.

Graphic rendering of the Perris North Groundwater Treatment Facility.

Our fiscal solutions team collaborated with consulting and EMWD to support the preparation of a successful State Water Resources Control Board (SWRCB) Proposition 1 Groundwater Grant Application. This secured $36 million for the Perris North Groundwater Program. Our client was subsequently awarded an additional $26 million in grant funding. Together, these two grants cover a significant portion of the project cost, offsetting the burden that would otherwise be passed on to rate payers.

Looking towards the future water supply

As with many water suppliers in arid regions of the country, EMWD wants to manage their current water supply and plan for future water demands. To help the district determine its best approach, Woodard & Curran conducted a high-level evaluation of banking imported water from the Metropolitan Water District of Southern California in the Lakeview Subbasin via surface infiltration. Lakeview Subbasin underlies the valley between the Bernasconi Hills and the Lakeview Mountains, east of the Perris Reservoir, which is the southern terminus of the California State Water Project.

Our team developed two conceptual recharge projects and estimated planning-level costs, including capital and annualized operations and maintenance costs. We modeled groundwater at the two sites to estimate the feasible range of recharge and extraction. Based on modeled recharge amounts, we calculated the unit cost of water and presented it on a cost curve. The study found that groundwater banking was feasible and provided support for further work.

Should EMWD pursue a groundwater banking project in the Lakeview Subbasin, the district would develop a new supply of potable water replenished by imported water and alleviate the migration of lower quality groundwater into the Lakeview Subbasin from the adjacent Perris South Subbasin.

Key Project Team Members

Brian Dietrick PE Senior Project Manager Water
Reza Namvar PE, PhD Senior Technical Manager Water
Scott Goldman PE, BCEE Senior Program Leader Water